Win the claims you are already entitled to.

AI and software for contractors, concessionaires, developers and awarding authorities, across claims, project controls, procurement and assets.

The claim, and whether you can prove it
The claimWhat the contract requiresWhat is usually missing
Extension of time
Notice inside the contractual window, and records for the period
The delay analysis tied to the programme as it stood then
Change in scope
The instruction, the varied quantity and the rate basis
The written instruction, when the change arrived verbally
Idling of plant and labour
Deployment records for exactly the period claimed
Daily records that tie the resource to the affected activity
Price escalation
The index basis, the clause, and the applicable period
The build-up, reconciled to what was actually purchased
Interest on delayed payment
Certified amounts, certification dates, the interest clause
The certification trail across three revisions of the bill
Hindrance and force majeure
Notice, mitigation taken, and a record of the event
Dated site records and photographs from the days it mattered

The gap is almost never the entitlement. It is the record that would have proved it.

In brief

We turn the records your site already produces into evidence that holds.

EigenSpark builds AI systems and the software around them for EPC contractors, concessionaires, developers and awarding authorities. Your sites already generate daily progress reports, measurement books, correspondence, drawings and photographs. We read all of it, tie each event to the contract clause it triggers, and keep the register current while the project runs. The same records then drive progress, procurement and asset work.

What we cover

Built for the contracts and clearances you work under.

Model agreements, dispute rules, clearances and site compliance.

The 2026 dispute routeEPC contractsHAM and BOT agreementsNHAI and MoRTH circularsPM Gati Shakti clearancesEnvironment complianceLabour and site returnsArbitration and conciliation

The starting position

Why good claims fail.

Thin evidence behind real entitlements, unreadable daily reports, and progress nobody can prove.

The entitlement is real and the evidence is thin

A verbal instruction, an undated photograph, a daily report that describes only the weather. The gap shows up years after it could have been closed.

The daily progress report is a Word file nobody reads

Every site produces one and almost nobody can search them. The deployment record and the hindrance log are buried inside.

Physical and financial progress tell different stories

The programme, the measurement book and the bill disagree. Every forecast of cost to complete inherits that disagreement.

The contract obligations sit in a lever arch file

Notice periods, certification windows and escalation formulae, in a document nobody opens when it matters. A missed notice kills a good claim.

How an engagement runs

How we work with you.

Read the records you already produce, set up one project, then carry it to the rest.

01

Read the records you already produce

Two to three weeks inside your daily progress reports, measurement books, correspondence, programme and billing data for one project, to establish what is capturable today and where the evidence gaps sit on live entitlements.

  • Daily reports parsed and made queryable
  • Obligations and notice windows extracted from the contract
  • Evidence gaps listed against live claims
02

One project, taken end to end

A single project instrumented: the obligation register live against the programme, daily records structured as they arrive, and one claim assembled from them. Small enough to prove in a quarter, and it pays for itself on one entitlement.

  • Notice periods flagged before they close
  • Records captured at the time, in the field
  • A claim pack assembled from the record
03

The layer that carries the next project

Ingestion, the obligation library, the record structure and the claim templates are shared. The second project is set-up, and your contracts team maintains the library.

  • Contract obligation library owned by your team
  • Standard record structure across projects
  • Deployed in your own tenancy, offline-tolerant on site

Use cases

Twelve things we build for infrastructure teams.

Claims and contracts, then project controls, then procurement and assets, then the back office.

Claim pack assembly from site records

The entitlement, the clause, the chronology and the records assembled into one pack, with every assertion carrying the report or letter it rests on.

Continuous Compliance Monitor →

Contract obligation and variation register

Notice periods, milestones, certification windows and escalation formulae extracted into a live register, so an obligation is flagged while it can still be met.

Contract Risk Analyser →

Delay analysis against the programme

The as-planned and as-built programme compared activity by activity, with hindrances from the daily record mapped on, so the delay story is built from evidence.

AI & Data Strategy →

Daily progress reports made queryable

Site reports read into structured records: activities, deployment, plant hours, weather and instructions, so a question about last October takes a minute.

Document Intelligence Engine →

Cost to complete and cash forecasting

Committed cost, measured work, certified amounts and the remaining programme read into one forecast, and every disagreement between the three surfaced by name.

Data Engineering & Platforms →

Subcontractor and vendor performance

Deployment, output, rework, safety and billing read together per subcontractor and per package, so a package heading for trouble shows up early.

AI & Data Strategy →

Tender and bid scrutiny

Bids read against the eligibility criteria, the priced bill of quantities and the specification, with every deviation linked to the clause it fails.

Contract Risk Analyser →

Material reconciliation and wastage

Purchase, receipt, consumption and theoretical requirement reconciled per material and per structure, with the variance ranked by value.

Data Engineering & Platforms →

Plant and equipment utilisation

Log sheets, fuel issues and deployment records read into utilisation and idling per machine, which supports both the hire decision and the idling claim.

Predictive Maintenance System →

Environment and labour compliance evidence

Consent conditions, monitoring results and labour registers assembled continuously against the obligations that apply, with lapses flagged early enough to fix.

Continuous Compliance Monitor →

Site incident and safety pattern analysis

Incidents, near misses and toolbox records read for the conditions that keep repeating, with the statutory reporting clock tracked against each event.

AI & Data Strategy →

Drawing, RFI and design change register

Drawing revisions, requests for information and design changes tracked against the activities they affect, with the cost and time consequence recorded on arrival.

Document Intelligence Engine →

The engineering half

What sits under the AI.

Four layers of ordinary engineering. The first one carries every claim you make.

01
Site record

What the project already produces every day

Daily reports, measurement books and correspondence exist on every project. Almost none of it is queryable, and that is the whole opportunity.

Daily progress reportsMeasurement booksMuster and deploymentPlant log sheetsSite photographsSurvey and levelsCorrespondence and instructions
02
Integration

The systems a project already runs on

The ERP and the scheduling tool stay. Most of the effort is connecting them to what the site actually records.

ERP and billingPrimavera and schedulingBIM and drawing registersGISGeM and CPPPe-way bill and GSTWeighbridge and stores
03
Application

Screens for planning, QS and contracts

Built for a site engineer on a phone with no signal and a contracts manager assembling a pack, with the source of every assertion one click away.

Field capture, offlineObligation registerClaim workspaceEvidence linkingVariation trackerRole-based accessDocument archive
04
Reporting

The numbers the site and head office agree on

Defined once and used everywhere, so the progress review, the cost report and the claim cannot disagree. Your team runs and owns it.

Physical versus financial progressCost to completeClaim ageing and valueNotice periods openPlant utilisationMaterial varianceSafety indices

We also run the training that goes with it: SQL and data engineering, cloud, enterprise systems and cybersecurity, alongside the AI tracks. A team that cannot query its own data cannot specify a model either.

What we offer infrastructure and public works teams

Four ways to work with us.

Most teams start with one project and the contract that governs it.

Working in a specific function? See how we help Project Management teams.

Security and controls

How we keep you in control.

The claim stays yours. Every assertion links to a dated record that already existed.

01

The claim is your team’s, start to finish

We build the register, the record and the pack. The entitlement position, the legal strategy and the submission stay with your contracts team and your counsel.

02

Every assertion links to a dated record

A statement in a claim pack carries the daily report, the letter or the measurement it rests on, with the date it was created. A record assembled afterwards is worth very little, and the system is built to prevent that.

03

It works where there is no signal

Field capture holds its state offline and synchronises when connectivity returns, because the records that matter most are made at the places with the worst network.

04

The obligation library belongs to you

Clauses, notice periods, milestone definitions and escalation formulae are managed by your contracts team. A new form of contract is configuration.

FAQs

Questions infrastructure teams ask us.

Why does the 2026 dispute change matter to us?

NHAI's January 2026 circular splits the dispute route by value on its model agreements: claims below Rs 10 crore go to arbitration and larger ones are pushed to conciliation or the civil courts. A conciliation room and a court timeline both reward the party that already holds dated, contemporaneous records, and neither will order the discovery a tribunal might have. The practical answer is to capture the record while the work is happening, which is what the first two tracks on this page do.

Do you prepare or argue our claims?

We build the register, the structured record and the assembled pack, with every assertion linked to the document it rests on and the evidence gaps listed. The entitlement position, the commercial strategy and the submission itself stay with your contracts team and your counsel. We are engineers, and we are clear about where that ends.

Our daily progress reports are Word files. Can anything be done with them?

Yes, and they are usually the single most valuable asset on the project. Site reports are read into structured records covering activities, deployment, plant hours, weather, hindrances and instructions, which makes the whole history queryable. Delay analysis, idling claims and subcontractor performance all come out of the same structured record.

Will this work at a site with no network?

It is built for that. Field capture holds its state offline and synchronises when connectivity returns, because the records that matter most are made at the places with the worst network. Nothing that a site engineer has to do depends on a live connection.

We are the awarding authority. Does this help us?

Yes, and mostly the same components read from the other side. Bid scrutiny, the obligation register, progress and cost verification, material reconciliation and statutory compliance evidence all apply. Our public sector page covers the governance and audit requirements that come with being the awarding body.

How long before this pays for itself?

Usually on the first entitlement it saves. The obligation register alone catches notice periods that would otherwise close, and a single missed notice on a large project is worth more than the engagement. The structured record work takes a quarter on the first project and materially less on the second.

Is all of this AI?

No, and the parts that are not are usually what makes the AI work. Integration with the ERP and the scheduling tool, the record structure, the field application and the obligation library are ordinary engineering, and they are most of the effort. The same is true of the training: alongside the AI tracks we run SQL, data engineering, cloud, enterprise systems and cybersecurity.

Where does the data sit?

In your own tenancy. Project records are commercially sensitive and frequently disputed, so they stay inside your boundary with access logged. Where a hosted model is used for text work, what is sent to it is agreed and recorded before build.

Related

Related pages.

The two products this ships as, the service under them, and the teams that own it.

Send us one live claim and the records behind it.